PROJECT ELYASIA

PHASE 1: SYNTHESIS

Translating theoretical non-linear magnetohydrodynamics into physical hardware.

Current Directive

IN PROGRESS

Objective: Construct the primary vacuum chamber to house the force-free Spheromak. Following the successful 1,000-step simulation solver, the physical container will act as the boundary flux conserver.

LATEST UPDATE // POST-SIMULATION PHASE
TELEMETRY VIDEO LOG

Commencing Hardware Fabrication

With the digital solver proving that perfectly conductive boundaries prevent magnetic helicity bleed-off, we are moving from ElmerFEM to the workbench. This video details the transition from purely digital states into our physical build strategy.

PENDING
ARCHIVE // JUNE 2026
HARDWARE 3D PRINTING

Manufacturing Platform Initiated

Precision is required to create the complex geometric alignments of the Spheromak. Alongside the heavy-duty capabilities of the Voron 2.4, a new Bambu P2S Combo has been deployed to the lab to rapidly accelerate the prototyping of custom coil forms, alignment jigs, and structural brackets for the polycarbonate chamber assembly.

PENDING
PENDING