PROJECT ELYASIA

PHASE 1: CARBON REV-2 HARDWARE SYNTHESIS

Coupled mechanical, cryogenic, pulsed-power, and embedded-control hardware specification for our 500 mm 1-Atmosphere Cold Phantom Testbed ($1,368.43 verified BOM).

Current Directive: Stage 1 Carbon Rev-2 Testbed

CARBON REV-2 LOCKED // 8 TRAPS RESOLVED

Safety & Coupled-Physics Architecture: Rather than pulling vacuum on an unlined 500 mm 3D-printed polycarbonate sphere (~8.1 metric tons of crushing load) or mounting a 1-ton pulsed launcher directly on brittle 4 mm FDM walls, Stage 1 isolates every load path and verifies full electromagnetic launch, catch, and 6-DOF active tomography at 1 atmosphere first:

View 28-Line Master BOM ($1,368.43) Simulate All 8 Fixes Generate Bambu P2S STLs

Carbon Rev-2 Hardware Subsystems

1. NUCLEO-G474RE & Hybrid Sensors

Replaces 52-week backordered BGA STM32G484VEH6 with in-stock LQFP silicon:

  • MCU: NUCLEO-G474RE / STM32G474VET6 (170 MHz, 184 ps HRTIM, 5× 4 Msps ADCs).
  • Observer Loop: 176 cycles (1.035 μs) D4h parity butterfly + 4-FMA copper-lune eddy filter.
  • Zero-Droop Array: 8× DRV5055A1 DC Hall + B-dot 160 Hz crossover (OPA4350UA) eliminates 85.4 ms wall-eddy crash.

2. Pulsed Power & Trifilar Catch

Full >4× silicon surge margin on both launch and regenerative catch:

  • Launch (Phase 1C): 400 V / 2,000 μF (160 J) + MCD95-12io1B SCR (25,300 A²s) + 100 μΩ shunts & AMC1301 isolation.
  • Catch (Phase 1D): 2× FF600R12ME4 half-bridges (13,000 A²s internal EC4 diodes) + 2,500 μF @ 350 V (153.1 J) + 4× 50 μF film bypass.
  • Trifilar Coil 2: 3×12 AWG parallel strands (6.0 mΩ @ 300 K, 0.77 mΩ @ 77 K).

3. Cryo Phantom & Direct Artifacts

Downloadable open-hardware build files included directly in this release:

Hardware Engineering Log

NOVEMBER 2026 // CARBON REV-2 COUPLED AUDIT & BOM LOCK
CARBON REV-2 77K EC-ALUMINUM TRIFILAR COIL 2 99% He / 1% H₂

8 Cross-Subsystem Hardware Traps Caught & Resolved Before Ordering

Treating all four subsystems as one coupled machine caught seven major traps plus an eighth winding-loss nuance: swapping 77 K copper for 2.50× superior 1060-O EC-aluminum, routing the 9,253 N launch recoil through 12.7 mm G10 columns, upgrading Catch Bridge silicon to dual FF600R12ME4 modules + 2,500 μF @ 350 V, adding 8 zero-droop Hall sensors + a 4-FMA copper-lune eddy filter, switching to Vitroperm 500F antipodal chokes, specifying 3×12 AWG trifilar Catch Coil 2, and pivoting Stage 2 to radiation-free 99% He / 1% H₂ Penning puffing.

Open Full Carbon Audit Master BOM & Horizon
LATE OCTOBER 2026 // 6-DOF TOMOGRAPHY, CONFORMAL CRADLE & P2S STLs
CONFORMAL CRADLE STM32G474 BAMBU LAB P2S

15-State 6-DOF Electrodynamics, Parity Butterfly & 1:4 Hopfion Monument

Coupled elliptic-integral ODEs uncovered the 7× Conformal Toroidal Cradle efficiency gain, unbiased pickup Flux-Cancellation Null, transient inductance collapse (180.4 → 68.4 μH), equatorial saddle midplane blindspot, and Rank 4/4 Split-Hemisphere Figure-8 control. Audited the STM32G484VEH6 BGA/export trap in favor of NUCLEO-G474RE, and authored parametric Bambu Lab P2S STL generators for both Stage 1 hardware and our 125 mm cutaway Hopfion desk monument.

6-DOF Tomography Lab Hopfion Monument STL
OCTOBER 2026 // v1.0 → v2.0 SAFETY PIVOT
1-ATM TESTBED SLOTTED SHELL

Transition to Slotted Copper Flux Conserver & 1-Atm Calibration

Reclassified the 500 mm 3D-printed polycarbonate sphere from a vacuum vessel (~8.1 metric ton implosion risk) to a 1-atmosphere structural fixture lined with slotted C110 copper straps, reserving vacuum plasma work for a certified 304L stainless-steel chamber in Stage 2.

Read v1.0 Audit Archive